中文字幕一区二区三区四区无码视频_中文字幕韩国精品无码一区在线观看_无码网站免费在线观看中文字幕_人妻精品久久久久中文字幕一区二区三区

Contact Us

AC Fan before installation tools ready

Date: 2016-7-18   Click: 1971 Times

"AC Fan" tools preparatory work before installation we can not say more, and other preparatory work by chapter is about the same way, the only difference is directly connected to the wind turbine installation site installation dimensions, as well as reserve installation size requirements is relatively high, the permissible error range is relatively small, foundation dimensions deviation should be within the range of ± 20mm, hollow center of each reserve size deviation should be ± 10mm between, so since we need the fan the size of each extra attention, the error is only installed to a minimum in order to make the fan installation more smoothly.

Back to: Industry news

+86-0769-83660708

Home Product News Contact